Sustainable management of construction and demolition (C&D) waste is a growing environmental priority, particularly in rapidly developing countries such as Saudi Arabia. Among the key strategies for sustainable C&D waste management is source segregation; however, its implementation remains inconsistent and insufficiently understood. This study aims to explore the current practices, challenges, and opportunities associated with source segregation in Saudi Arabia's C&D waste sector.

Design/methodology/approach

A qualitative research design was adopted, involving in-depth semi-structured interviews with 19 stakeholders representing government agencies, private waste companies, recycling facilities, and academic institutions. The data were analysed using thematic analysis.

Findings

Thematic analysis revealed five major themes: current practices and benefits, barriers and enablers, policies and regulations, stakeholder roles and collaboration and circular economy (CE) integration and future opportunities. Although participants expressed strong support for source segregation, findings indicate that systemic barriers, such as limited awareness, institutional fragmentation and high operational costs, continue to impede progress. Conversely, enabling conditions, including government support, technological innovation and academic-industry collaboration, were identified as key drivers for improvement.

Originality/value

This study provides a contextualised and stakeholder-centred understanding of source segregation within the Saudi construction industry. It offers practical insights for policymakers and practitioners seeking to advance sustainable waste management and accelerate the integration of CE principles.

The building and construction sector is among the most resource-intensive industries worldwide, generating extensive environmental, economic, and social impacts. Globally, construction and demolition (C&D) waste accounts for around 30% of total solid waste, reaching 700 to 800 million tonnes annually within the European Union (Haas et al., 2020; Iacoboaea et al., 2019; Soto-Paz et al., 2023). Roughly 35% of this waste is still sent to landfills without treatment or recycling, posing ongoing environmental and resource-management challenges (Menegaki and Damigos, 2018; Purchase et al., 2022). As a cross-cutting industry, construction underpins nearly all other economic sectors by providing the physical infrastructure and assets essential to national development (Hassan et al., 2022; Townsend and Anshassi, 2023). C&D waste is composed of high-volume materials (e.g., concrete, wood, metals, bricks, asphalt, and glass), many of which possess substantial potential for reuse and recycling (Ulubeyli et al., 2017; Shooshtarian et al., 2020; Purchase et al., 2022). However, ineffective waste-management practices, particularly indiscriminate dumping and mixing of materials, continue to cause environmental degradation, resource loss, and public-health risks (Alsheyab, 2022; Atta and Bakhoum, 2024; Lee et al., 2024). In response, international policy and academic discourse increasingly advocate the adoption of circular economy (CE) principles as a sustainable alternative to the traditional linear “take–make–dispose” model.

CE promotes resource efficiency, waste minimisation, and the reintegration of materials into production cycles. In the construction sector, transitioning to a circular model requires systemic change across the entire project lifecycle, from material selection and building design to waste handling and end-of-life recovery (Hasibuan et al., 2025; Purchase et al., 2022; Swarnakar and Khalfan, 2024). Core strategies include using recycled aggregates, adopting modular construction systems, implementing material passports, and developing closed-loop supply chains. The European Commission estimates that the building and construction sector accounts for approximately 37% of global greenhouse gas emissions. Embracing CE principles offers a pathway to reducing this footprint, achieving net-zero targets and accelerating progress toward the Sustainable Development Goals (SDGs) in the face of the global climate crisis (Finamore and Oltean-Dumbrava, 2024). Moreover, applying circular principles within the C&D waste sector can unlock economic value, create green employment opportunities, and enhance material security, particularly in countries heavily dependent on imported raw materials (Mandpe et al., 2023; Mayanti and Helo, 2024).

In addition to the CE perspective, Institutional Theory offers a complementary lens for analysing the governance dimension of the C&D waste sector. Institutional Theory posits that organisational behaviour is shaped by regulative, normative, and cultural-cognitive forces that influence structures and actions (Scott, 2013). Within the context, overlapping mandates, weak accountability, and conflicting institutional logics often lead to fragmented policy implementation (Dahlmans et al., 2024). For example, recent research has shown that fragmentation among ministries and regulatory agencies can delay the execution of CE and waste management policies in developing countries (Noufal et al., 2020; Serge Kubanza and Simatele, 2020). Similarly, studies in the Gulf region reveal that ambiguous role delineation between municipalities and environmental authorities creates inefficiencies in enforcing waste segregation standards (Hemidat et al., 2022; Nie et al., 2024).

Within this framework, source segregation, the on-site separation of C&D waste materials at the point of generation, plays a foundational role by enabling high-quality material recovery and reducing contamination that compromises recycling efficiency (Poon et al., 2001). Unlike mixed-waste collection, which often results in contamination and loss of recyclability, source segregation improves material purity, enhances recycling efficiency, and reduces the cost and complexity of downstream treatment. While many studies highlight segregation's technical benefits, particularly in improving recycling rates (Poon et al., 2001; Talla and McIlwaine, 2024; Wang et al., 2010), others argue that socio-institutional barriers often outweigh these operational benefits in practice (Li et al., 2011; Rangga et al., 2023; Shooshtarian et al., 2020). Without effective segregation at the source, CE strategies risk being undermined by inefficiencies, higher costs, and declining material quality. Thus, source segregation is not only as a technical action, but as a strategic intervention that underpins the success of circular construction, particularly in rapidly developing contexts such as Saudi Arabia, where large-scale urban and infrastructure projects form the cornerstone of Vision (2030).

Beyond its technical and economic merits, source segregation has broader implications for policy compliance, public awareness, and industry behaviour. Countries such as Spain, France, Austria, and Germany have integrated mandatory segregation policies into their national waste strategies, supported by robust infrastructure, regulatory enforcement, and public-private collaboration (Colmenero Fonseca et al., 2023). Conversely, many countries in the Middle East and North Africa (MENA) region, including Saudi Arabia, remain at an early stage of developing such practices.

Over the past 2 decades, the rapid expansion of the construction sector in Saudi Arabia has become one of the largest generators of C&D waste in the region. In this context, source segregation is no longer an aspirational goal but a critical operational requirement for achieving sustainable C&D waste management. According to recent studies, approximately 50% of Saudi Arabia's total solid waste originates from C&D activities, exceeding 120 million tonnes annually (Alazmi et al., 2025). Moreover, the volume of waste generated is growing in tandem with the pace of development. It is estimated that 50–60 tonnes of C&D waste are produced per 1,000 m2 of new construction and 600–700 tonnes per 1,000 m2 for the demolition of older buildings (Ouda et al., 2018). In response to this challenge, Saudi Vision 2030 identifies C&D waste as a strategic priority, aiming to reduce the proportion sent to landfills by 60% through an integrated strategy comprising 12% recycling, 35% reuse, and 13% treatment (Haider et al., 2022). Additionally, Vision 2030 aspires to recycle up to 90% of total waste, contributing an estimated SAR 120 billion to the national economy and creating nearly 100,000 new jobs (Alazmi et al., 2025).

To achieve these ambitious goals, Saudi Arabia has recently introduced a regulatory and policy framework that, while still in its early stages, reflects a strong national commitment to sustainable waste management. As illustrated in Figure 1, this framework is anchored by the National Waste Management Law (MWAN), which is responsible for overseeing and regulating waste management practices across the Kingdom (MWAN, 2019). Complementing the MWAN, the National Centre for Environmental Compliance (NCEC) plays a critical role in monitoring, enforcing, and ensuring compliance with environmental regulations, including those governing C&D waste segregation (NCEC, 2019). The Ministry of Municipal and Rural Affairs and Housing (MOMRAH) also contributes by establishing and implementing environmental standards for C&D waste management, pollution control, and sustainability within the construction sector.

Figure 1
A flow diagram shows frameworks and processes for construction and demolition waste management and circular economy.The flow diagram shows a structured system for “Sustainable Construction and Demolition (C and D) Waste Management Framework” arranged from top to bottom with connected solid and dashed arrows, side stakeholders, and a central process block, alongside “Circular Economy Approach” on the right. At the top, a rectangular box labeled “Legislative and Regulatory Framework” includes an icon of a document and gavel and text stating it establishes laws, policies, and guidelines for C and D waste management and segregation, ensuring legal compliance. A solid downward arrow leads to the next box labeled “Monitoring and Compliance Framework”, which includes a chart icon and text stating it ensures that C and D waste segregation, recycling, and disposal adhere to regulatory standards. Another solid downward arrow leads to “Implementation and Execution Framework”, which states it oversees the practical application of waste management regulations by construction organisations, recycling facilities, and P P P s. From the left side of the monitoring level, a solid left-pointing arrow connects to “Ministry of Municipal and Rural Affairs and Amanas”, shown with an official emblem. From the right side of the legislative level, a solid right-pointing arrow connects to “National Waste Management Law (M W A N)” with logo. From the right side of the monitoring level, a solid right-pointing arrow connects to “National Center for Environmental Compliance (N C E C)” with logo. At the implementation level, a dashed rectangular box on the left labeled “Construction Organisations” with a crane icon connects via a solid right-pointing arrow into the central process block. On the right, a dashed rectangular box labeled “Recycling Facilities” with an industrial icon and text “Saudi Investment Recycling Company (S I R C)” connects via a solid left-pointing arrow into the same process block. From “Construction Organisations” and “Recycling Facilities” a downward dashed arrow connects to the central dashed process boundary. The central dashed boundary contains the operational flow. A box labeled “Construction Site” connects by a solid right-pointing arrow to “Waste Generation”, then by a solid downward arrow to “Waste Collection”, followed by “Waste Storage”, and then to “Waste Segregation”. A dotted box labeled “On-site (Source)” is positioned beside segregation. From “Waste Segregation”, three solid downward branches lead to “Reused Waste”, “Recyclable Waste”, and “Non-recyclable Waste”. From “Recyclable Waste”, a dashed downward arrow leads to “Waste Transportation”. From “Non-recyclable Waste”, a solid downward arrow leads to “Waste Transportation” and another downward arrow“Landfill”. From “Reused Waste”, a solid downward arrow leads to “On-site” and another to “Market”. From “Waste Transportation”, a solid downward arrow leads to “Recycling Station”. From “Market” and “Recycling Station”, vertical arrows labeled “Product” point downward. At the bottom, a central icon of handshake represents “Customers”, with arrows labeled “Output (Products)” pointing toward it from both left and right sides. Beneath, categories of customers are listed from left to right as “Construction Organisations”, “Infrastructure Developers”, “Manufacturing Industries”, “Road Construction Agencies”, and “Landscaping Companies”.

Framework for source segregation of C&D waste in Saudi Arabia

Figure 1
A flow diagram shows frameworks and processes for construction and demolition waste management and circular economy.The flow diagram shows a structured system for “Sustainable Construction and Demolition (C and D) Waste Management Framework” arranged from top to bottom with connected solid and dashed arrows, side stakeholders, and a central process block, alongside “Circular Economy Approach” on the right. At the top, a rectangular box labeled “Legislative and Regulatory Framework” includes an icon of a document and gavel and text stating it establishes laws, policies, and guidelines for C and D waste management and segregation, ensuring legal compliance. A solid downward arrow leads to the next box labeled “Monitoring and Compliance Framework”, which includes a chart icon and text stating it ensures that C and D waste segregation, recycling, and disposal adhere to regulatory standards. Another solid downward arrow leads to “Implementation and Execution Framework”, which states it oversees the practical application of waste management regulations by construction organisations, recycling facilities, and P P P s. From the left side of the monitoring level, a solid left-pointing arrow connects to “Ministry of Municipal and Rural Affairs and Amanas”, shown with an official emblem. From the right side of the legislative level, a solid right-pointing arrow connects to “National Waste Management Law (M W A N)” with logo. From the right side of the monitoring level, a solid right-pointing arrow connects to “National Center for Environmental Compliance (N C E C)” with logo. At the implementation level, a dashed rectangular box on the left labeled “Construction Organisations” with a crane icon connects via a solid right-pointing arrow into the central process block. On the right, a dashed rectangular box labeled “Recycling Facilities” with an industrial icon and text “Saudi Investment Recycling Company (S I R C)” connects via a solid left-pointing arrow into the same process block. From “Construction Organisations” and “Recycling Facilities” a downward dashed arrow connects to the central dashed process boundary. The central dashed boundary contains the operational flow. A box labeled “Construction Site” connects by a solid right-pointing arrow to “Waste Generation”, then by a solid downward arrow to “Waste Collection”, followed by “Waste Storage”, and then to “Waste Segregation”. A dotted box labeled “On-site (Source)” is positioned beside segregation. From “Waste Segregation”, three solid downward branches lead to “Reused Waste”, “Recyclable Waste”, and “Non-recyclable Waste”. From “Recyclable Waste”, a dashed downward arrow leads to “Waste Transportation”. From “Non-recyclable Waste”, a solid downward arrow leads to “Waste Transportation” and another downward arrow“Landfill”. From “Reused Waste”, a solid downward arrow leads to “On-site” and another to “Market”. From “Waste Transportation”, a solid downward arrow leads to “Recycling Station”. From “Market” and “Recycling Station”, vertical arrows labeled “Product” point downward. At the bottom, a central icon of handshake represents “Customers”, with arrows labeled “Output (Products)” pointing toward it from both left and right sides. Beneath, categories of customers are listed from left to right as “Construction Organisations”, “Infrastructure Developers”, “Manufacturing Industries”, “Road Construction Agencies”, and “Landscaping Companies”.

Framework for source segregation of C&D waste in Saudi Arabia

Close modal

Although Saudi Arabia has outlined ambitious targets and developed a regulatory framework for sustainable waste management, a significant gap remains between policy aspirations and on-ground practice, particularly in the area of source segregation. Despite its centrality to effective C&D waste management, source segregation remains underrepresented as a distinct component within current national strategies and targets. This raises critical questions regarding the institutional, operational, and behavioural dynamics shaping C&D waste practices in the Kingdom. What roles do different stakeholders play in promoting or resisting source segregation? What are the perceived barriers, enablers, and incentives influencing its adoption? And how does source segregation align with broader sustainability goals, such as the transition to a CE or the reduction of carbon emissions?

From a literature perspective, while the importance of C&D waste management is widely acknowledged, especially given its projected growth in the coming years, the majority of studies addressing sustainable strategies (including source segregation) have been conducted in developed countries, with limited attention to emerging economies, such as Saudi Arabia (Soto-Paz et al., 2023). Moreover, although research on C&D waste management in Saudi Arabia has increased, studies focussing specifically on source segregation remain scarce. In most cases, segregation is mentioned as part of broader investigations into recycling practices or waste reduction strategies (Alazmi et al., 2025; Blaisi, 2019; Haider et al., 2022; Ouda et al., 2018; Sarhan et al., 2017). These studies tend to adopt quantitative or policy-review perspectives that describe overall waste volumes, recycling rates, or regulatory targets without exploring how segregation practices actually occur on construction sites, how actors interpret related policies, or why institutional misalignment persists. Consequently, positioning source segregation as a standalone research focus is both timely and necessary, offering valuable insights that could support the successful implementation of Saudi Arabia's sustainable waste management initiatives. In other words, this research moves beyond descriptive assessment by employing an in-depth qualitative approach that captures stakeholder experiences regarding on-site segregation behaviour.

Accordingly, this study seeks to fill this knowledge gap by conducting a thematic analysis of in-depth interviews with key stakeholders in Saudi Arabia's C&D waste. Through this approach, the study aims to.

  1. Investigate the current practices of source segregation in Saudi Arabia's C&D waste sector.

  2. Identify and analyse the main barriers and enabling factors (e.g., technical, institutional, economic, and cultural) that influence the successful adoption of source segregation practices in the Saudi building and construction sector.

  3. Evaluate the role of national policies, regulations, and institutional frameworks in shaping source segregation efforts and promoting CE outcomes in the construction industry.

This study adopted a qualitative research approach, utilising thematic analysis, to investigate the source segregation process of C&D waste in Saudi Arabia. Many considerations drove this choice. First, source segregation of C&D waste in Saudi Arabia is an underexplored and context-specific practice. Quantitative data are scarce, making qualitative inquiry ideal for generating foundational understanding (Creswell and Creswell, 2014; Gummesson, 2006). Second, the issue involves multiple stakeholders (e.g., government authorities, contractors, recycling companies, and academics) whose experiences, perceptions, and interactions cannot be captured through numerical data alone. A qualitative approach allows for a deeper understanding of how institutional, behavioural, and operational factors influence segregation practices. Third, waste governance in Saudi Arabia is shaped by complex socio-institutional arrangements and regulatory overlaps, making qualitative methods suitable for exploring these dynamics and revealing how fragmentation or coordination among institutions can affect implementation. Fourth, qualitative research provides the flexibility needed to investigate an evolving policy environment such as Vision 2030, where attitudes, awareness, and institutional capacities are rapidly changing. Finally, qualitative inquiry enables us to develop contextualised, policy-relevant insights that can guide decision-makers toward designing more effective segregation systems tailored to the Saudi situation.

The primary source of data for this study was the perspectives of selected participants, including experts and stakeholders directly involved in the building and construction sector. The initial sample consisted of 34 potential participants who were identified through professional networks, governmental directories, and industry associations related to C&D waste management in Saudi Arabia. From this pool, 19 participants were ultimately selected based on three key criteria: (1) direct professional involvement in C&D waste generation, management, or regulation; (2) a minimum of three years of experience in the construction, recycling, or environmental policy sector; and (3) demonstrated knowledge or decision-making capacity related to waste segregation practices. Thematic saturation was reached by the 19th interview, at which point no new codes or themes were identified.

A purposeful sampling strategy was employed to ensure that participants were well-suited to the research objectives and could provide relevant and meaningful insights (Herchline, 2024; Palinkas et al., 2015). The participants were categorised into four main stakeholder groups: academics (2), Construction contractors and C&D waste services providers (7), government organisation representatives (4), and recycling facility representatives (6). Their professional experience ranged from 3 to 15 years, offering a diverse and informed range of viewpoints. It is worth mentioning that although the sample was not evenly distributed across stakeholder groups, with only two academics included, this was intentional and aligned with the study's focus on practical implementation rather than theoretical perspectives. Greater representation was given to practitioners, regulators, and recycling facility managers directly involved in daily C&D waste management operations. Academics were included to provide complementary analytical viewpoints. This purposeful imbalance ensured that the data reflected real-world practices, institutional dynamics, and policy challenges most relevant to the research aims. The interviews were conducted between February and March 2025, with 12 interviews conducted online and the remaining 7 conducted face-to-face. Each participant responded to a set of 15 open-ended questions, with interview durations ranging from 40 to 90 min. Ethical approval for this study was granted by the RMIT University DSC, the College Human Ethics Advisory Network CHEAN (No: 2024–27526-25483). Table 1 provides a detailed overview of the participant profiles.

Table 1

Participant demographics and interview details

IDCategoryYears of experienceMode of interviewDuration (min)Position
AC_01 Academics Online 43 Teaching staff in waste management 
AC_02 Online 40 Teaching staff in waste management 
WC_01 Construction contractors and C&D waste services providers 15 Online 50 Director of waste management 
WC_02 Online 47 Operation manager 
WC_03 Online 68 Founder 
WC_04 Face-to-face 50 Business developer 
WC_05 15 Online 45 Director of waste management 
WC_06 Online 49 Waste management operation 
WC_07 Online 42 Operation manager 
GO_01 Government organisation representatives 10 Online 58 Innovation and research department 
GO_02 Online 53 Innovation and research department 
GO_03 10 Face-to-face 41 Director of waste management in Makkah 
GO_04 15 Face-to-face 62 Director of urban planning 
RF_01 Recycling facility representatives Face-to-face 59 Site manager 
RF_02 Face-to-face 60 Site manager 
RF_03 10 Face-to-face 90 Project manager 
RF_04 15 Online 47 Specialist in waste technology 
RF_05 10 Face-to-face 48 VP 
RF_06 Online 55 Operation manager 
IDCategoryYears of experienceMode of interviewDuration (min)Position
AC_01 Academics Online 43 Teaching staff in waste management 
AC_02 Online 40 Teaching staff in waste management 
WC_01 Construction contractors and C&D waste services providers 15 Online 50 Director of waste management 
WC_02 Online 47 Operation manager 
WC_03 Online 68 Founder 
WC_04 Face-to-face 50 Business developer 
WC_05 15 Online 45 Director of waste management 
WC_06 Online 49 Waste management operation 
WC_07 Online 42 Operation manager 
GO_01 Government organisation representatives 10 Online 58 Innovation and research department 
GO_02 Online 53 Innovation and research department 
GO_03 10 Face-to-face 41 Director of waste management in Makkah 
GO_04 15 Face-to-face 62 Director of urban planning 
RF_01 Recycling facility representatives Face-to-face 59 Site manager 
RF_02 Face-to-face 60 Site manager 
RF_03 10 Face-to-face 90 Project manager 
RF_04 15 Online 47 Specialist in waste technology 
RF_05 10 Face-to-face 48 VP 
RF_06 Online 55 Operation manager 

The study followed the six-phase thematic analysis framework proposed by Braun and Clarke (2006), which includes: (1) familiarisation, (2) generating initial codes, (3) developing interpretive codes, (4) reconstructing themes, (5) reviewing and refining themes, and (6) defining and naming themes (Braun and Clarke, 2006). All interviews were conducted in Arabic and then translated and transcribed into English for analysis. The transcripts were coded manually using an iterative process that combined both descriptive and interpretive coding. Initial codes were derived directly from participants' responses and were then organised into broader themes that captured recurring patterns and underlying meanings. The coding process was carried out systematically to ensure internal consistency and achieve thematic saturation. ATLAS.ti software (ATLAS.ti, 2025) was used to support the coding process and get the final set of themes. Comprehensive details of the thematic analysis procedure are provided in the supplementary document attached to this manuscript.

The thematic analysis resulted in five main themes that collectively illustrate the landscape of source segregation of C&D waste in Saudi Arabia: (1) current practices and benefits, (2) barriers and enablers, (3) policies and regulations, (4) stakeholder roles and collaboration, and (5) circular economy integration and future opportunities.

Participants consistently reported a significant lack of source segregation of C&D waste across most projects in various cities throughout Saudi Arabia. As one interviewee noted, “ …. . Source separation has not yet been fully adopted” [RF_01]. Even in cases where source segregation was attempted, it was typically conducted in an entirely manual and rudimentary way: “Upon arrival, workers manually segregate the materials, separating plastic from iron and other recyclable materials.” [RF_01]. Moreover, some participants went further, confirming the complete absence of source segregation practices in Saudi Arabia:

“[There is still no actual waste segregation at the source in Saudi Arabia] — that's correct.” [WC_06].

Participants attributed this to many underlying reasons. One interviewee pointed to a flawed understanding of the importance of source segregation: “There's also a perception that even if they separate waste on-site, it might end up mixed again during transportation or disposal.” [GO_01]. Others cited systemic issues, such as the lack of a structured segregation framework and standardised practices: “Unfortunately, there is no structured source segregation system in place for C&D waste ….” [GO_03].

Despite this widespread view that source segregation is either at a very early stage or entirely absent in many Saudi construction projects, many participants highlighted active recycling efforts of C&D waste, particularly in cities such as Riyadh. This difference in participant perspectives reflects both a geographical divide (Riyadh versus other regions, as the capital with more advanced institutional and recycling infrastructure) and a project-scale divide (mega-projects versus standard construction projects). Nine quotes from seven participants (e.g., RF_01, RF_03, WC_02, GO_02) recognised Riyadh as a model for best practices, especially due to the availability of recycling facilities like Akam. Figure 2 presents selected participant quotes highlighting Riyadh's recycling initiatives.

Figure 2
A conceptual diagram shows Riyadh as a model for best practice linked to six supporting statements.The conceptual diagram shows a central rounded rectangle labeled “Riyadh as a model for best practice”, with six surrounding rounded rectangles connected to it by solid lines radiating outward. The layout is organized with three boxes at the top and three at the bottom, each connected to the center. At the top left, a box reads “11:1 paragraph 26, For example, in Riyadh, cement companies interested in the circular economy use advanced incinerator... in (WC underscore 04) Carbon Company 03.docx”. At the top center, a box reads “9:2 paragraph 30, This situation differs from Riyadh, where some facilities exist to help manage such waste, albeit st... in (WC underscore 02) Carbon Company 01.docx”. At the top right, a box reads “4:20 paragraph 49, So far, its activities are limited to Riyadh and have not expanded to other cities. in (RF underscore 03) SIRC Facility 01.docx”. At the bottom left, a box reads “16:19 paragraph 57, The Riyadh experience is considered a successful model, as it involves coordination between local an... in (GO underscore 02) MWAN 02.docx”. At the bottom center, a box reads “11:25 paragraph 92, That’s true. I’ve noticed there is a great deal of interest in this field in Riyadh, with experts ha... in (WC underscore 04) Carbon Company 03.docx”. At the bottom right, a box reads “9:1 paragraph 26, In Riyadh, there are dedicated recycling facilities, such as Akam, which provides a solution for con... in (WC underscore 02) Carbon Company 01.docx”.

Participant perspectives positioning Riyadh as a model for best practices in C&D waste recycling in Saudi Arabia

Figure 2
A conceptual diagram shows Riyadh as a model for best practice linked to six supporting statements.The conceptual diagram shows a central rounded rectangle labeled “Riyadh as a model for best practice”, with six surrounding rounded rectangles connected to it by solid lines radiating outward. The layout is organized with three boxes at the top and three at the bottom, each connected to the center. At the top left, a box reads “11:1 paragraph 26, For example, in Riyadh, cement companies interested in the circular economy use advanced incinerator... in (WC underscore 04) Carbon Company 03.docx”. At the top center, a box reads “9:2 paragraph 30, This situation differs from Riyadh, where some facilities exist to help manage such waste, albeit st... in (WC underscore 02) Carbon Company 01.docx”. At the top right, a box reads “4:20 paragraph 49, So far, its activities are limited to Riyadh and have not expanded to other cities. in (RF underscore 03) SIRC Facility 01.docx”. At the bottom left, a box reads “16:19 paragraph 57, The Riyadh experience is considered a successful model, as it involves coordination between local an... in (GO underscore 02) MWAN 02.docx”. At the bottom center, a box reads “11:25 paragraph 92, That’s true. I’ve noticed there is a great deal of interest in this field in Riyadh, with experts ha... in (WC underscore 04) Carbon Company 03.docx”. At the bottom right, a box reads “9:1 paragraph 26, In Riyadh, there are dedicated recycling facilities, such as Akam, which provides a solution for con... in (WC underscore 02) Carbon Company 01.docx”.

Participant perspectives positioning Riyadh as a model for best practices in C&D waste recycling in Saudi Arabia

Close modal

In addition, some participants documented recent successful efforts in C&D waste management, although these initiatives do not include on-site segregation:

“We've only been in the market for 8 to 10 months. However, we've managed to recycle around 700,000 tonnes, all of which have been directed to the landfills.” [WC_04].

“One of our recent initiatives is ‘Madinati’, a digital platform designed to track and manage all types of waste, including C&D waste.” [GO_03].

Moreover, participants expressed two distinct motivations for supporting source segregation of C&D waste: while some emphasised its economic benefits, others were more driven by its environmental value. Economically, participants mentioned reduced disposal costs, decreased consumption of raw materials, and job creation. As one participant explained, “Source segregation contributes economically by reducing disposal costs, generating revenue, creating job opportunities, and enhancing the circular economy.” [WC_05]. Another participant added, “… … The primary goal of recycling is not just waste disposal but also reducing the consumption of raw materials.” [WC_03]. On the environmental side, many participants highlighted benefits such as lowering carbon emissions and reducing pressure on landfills. “[Source segregation] reduces the consumption of natural resources. Extracting raw materials consumes energy and leads to significant carbon emissions,” noted one interviewee [RF_04].

Participants identified a wide range of factors that either hinder or facilitate the implementation of source segregation for C&D waste in Saudi Arabia. These insights reveal a complex interplay between institutional, operational, and perceptual dimensions. Table 2 presents a summary of the key barriers and enablers influencing the implementation of source segregation for C&D waste in Saudi Arabia.

Table 2

Critical barriers and enabling factors for source segregation for C&D waste in Saudi Arabia

Main barriersFrequency
Lack of awareness 27 
High operational cost of segregation 21 
Overlapping responsibilities 12 
Public scepticism toward recycled product quality 11 
Insufficient recycling infrastructure 
Price mismatch of recycled vs. raw materials 
Lack of transparency in segregation practices 
Variability in materials 
Logistical constraints 
10 Social resistance to recycled materials 
Main enablers 
Technology as a enabler of segregation 51 
Governmental support as a facilitator 19 
Academic research as a segregation enabler 
Main barriersFrequency
Lack of awareness 27 
High operational cost of segregation 21 
Overlapping responsibilities 12 
Public scepticism toward recycled product quality 11 
Insufficient recycling infrastructure 
Price mismatch of recycled vs. raw materials 
Lack of transparency in segregation practices 
Variability in materials 
Logistical constraints 
10 Social resistance to recycled materials 
Main enablers 
Technology as a enabler of segregation 51 
Governmental support as a facilitator 19 
Academic research as a segregation enabler 

One of the most frequently mentioned barriers was the lack of awareness. Participants explained that many stakeholders, including contractors and site workers, either misunderstood the purpose of segregation or doubted its benefits. As one recycling facility representative explained, “The biggest challenge was the lack of public awareness regarding recycling. There was a common belief that recycled materials were of no value, which led to an accumulation of waste on our end.” [RF_01]. Another critical obstacle was the high operational cost of segregation. Participants identified a range of cost factors, including the expenses associated with sorting equipment, landfill fees, infrastructure development, facility maintenance, and transportation logistics. “In reality, several steps in the recycling process make it costly and complex, and this represents one of the main challenges and barriers we face.” a waste company representative [WC_04].

Another frequently mentioned challenge was institutional fragmentation and overlapping responsibilities. Ten participants emphasised that unclear roles across government entities led to inconsistent practices and a lack of accountability. “But the problem lies in enforcing these laws, as the responsibilities of several executive bodies, such as municipalities and local councils, overlap without a single entity overseeing the entire process.” [RF_04]. Additional barriers included public scepticism toward recycled product quality, price mismatch between recycled and raw materials, lack of transparency in segregation practices, insufficient recycling infrastructure, variability in materials, logistical constraints, and social resistance to recycled materials. These were captured in several remarks:

“Moreover, many sectors struggle with a lack of transparency in waste processing.” [AC_01].

“At times, the cost of recycling is higher than traditional disposal, making contractors less motivated to choose sustainable solutions.” [WC_07].

Despite these challenges, participants also pointed to some key enablers that could facilitate the broader adoption of source segregation for C&D waste in Saudi Arabia. The most frequently cited enabler was the use of technology. Respondents emphasised that emerging technologies (e.g., automated sorting systems, smart bins, big data analysis, sensors, AI-based solutions, IoT technologies, and digital tracking platforms) can significantly enhance the source segregation processes. One participant noted that “Technology can help a lot, like waste tracking systems to trace origins and movement, and smart sorting equipment to distinguish recyclable from non-recyclable materials.“[GO_04]. Another participant highlighted how automation reduces dependency on labour and minimises error: “Automation is also a key tool in reducing the workload for workers in recycling centres, as robots can sort large volumes of waste in a shorter time” [RF_06]. Participants also referred to the role of digital systems in improving traceability and accountability in the segregation process. “Our organisation is improving reporting and tracking processes by using advanced technology to monitor the amount of waste segregated and recycled.” [WC_07].

The second most reported enabler was governmental support. This included the establishment of clear regulatory frameworks and the implementation of incentive structures. Participants emphasised that without strong governmental leadership and policy alignment, efforts to implement segregation systems often remain fragmented or voluntary. As one participant noted, “The government should support recycling by offering incentives such as compensating for price differences, increasing the cost of raw materials, or mandating a certain percentage of recycled materials in projects.” [WC_06]. Another participant focused specifically on the importance of financial incentives, stating, “Governments can play a key role in supporting the recycling sector by offering financial incentives and tax exemptions for companies that invest in recycling technologies.” [GO_02].

Lastly, academic research and innovation were recognised by several participants as an emerging enabler. Universities and research institutions were seen as key partners in developing context-specific technologies, conducting pilot projects, and generating evidence-based practices that can support implementation. Participants emphasised that investment in scientific inquiry and knowledge-sharing is essential to drive progress in this field. As one waste company representative noted, “Encouraging research and development in this sector is key to identifying the best methods for achieving environmental and economic goals.” [WC_07]. Another participant stressed the importance of continuous innovation, stating, “I would like to emphasise the importance of investing in scientific research and development to improve current practices.” [AC_01].

Participants offered varied and sometimes conflicting perspectives regarding the regulatory environment surrounding source segregation of C&D waste in Saudi Arabia. These contrasting views reflect the broader complexity of implementing regulatory frameworks in a sector that involves multiple stakeholders, diverse project scales, and evolving environmental and economic goals. Figure 3 presents a visual summary of these contrasting views regarding the regulatory framework for C&D waste source segregation in Saudi Arabia.

Figure 3
A conceptual diagram shows positive and negative regulatory factors with quotes, categories, and stakeholder links.The conceptual diagram shows two horizontal sections labeled “POSITIVE” at the top and “NEGATIVE” at the bottom, with vertical arrows on the left and right indicating direction, including a plus symbol for positive and a minus symbol for negative. In the top “POSITIVE” section, three green speech-bubble quotes are displayed. The left quote reads “the current policies are largely sufficient, but they could be improved through more precise strategies. (WC underscore 02)”. The center quote reads “[Regulations] It’s quite structured. There are specific regulatory frameworks and technical guidelines that outline what’s required for licensing. These include environmental and operational standards ... (GO underscore 01)”. The right quote reads “With the intervention of the relevant authorities, such as the municipality, stricter procedures have been put in place to regulate waste disposal. (RF underscore 01)”. Below these quotes, three rectangular boxes are shown. The left box is labeled “Improved regulatory oversight” with the number “2” and the label “Positive”. The middle box is labeled “Regulations are not the main concern” with the number “2” and the label “Positive”. The right box is labeled “Clear regulations with limited implementation” with the number “6” and the label “Positive”. Each box includes a horizontal bar indicator. Below these boxes, four stakeholder labels are arranged horizontally: “Academics”, “Construction contractors”, “Government Organization”, and “Recycling Facilities”. Blue dashed lines connect these stakeholders to the positive and negative factors above and below. In the bottom “NEGATIVE” section, three rectangular boxes are displayed. The left box is labeled “Licensing and inspection procedures” with the number “7” and the label “Negative”. The middle box is labeled “Lack of clear regulations” with the number “8” and the label “Negative”. The right box is labeled “Weak enforcement of regulations” with the number “11” and the label “Negative”. Each box includes a horizontal bar indicator. Below these boxes, three pink speech-bubble quotes are shown. The left quote reads “The fundamental obstacle is the weakness of legal frameworks. There are no strict regulations governing waste management, nor is there a real accountability system for violators. (WC underscore 06)”. The center quote reads “Currently, laws lack strict enforcement and effective implementation, which limits the success of recycling programs. (AC underscore 01)”. The right quote reads “There is a lack of clarity in the implementation of these policies, and their actual impact on improving waste management and recycling processes is virtually non-existent. (WC underscore 04)”. Dashed connecting lines link stakeholder groups to both positive and negative factors.

Contrasting perspectives on source segregation regulations for C&D waste in Saudi Arabia

Figure 3
A conceptual diagram shows positive and negative regulatory factors with quotes, categories, and stakeholder links.The conceptual diagram shows two horizontal sections labeled “POSITIVE” at the top and “NEGATIVE” at the bottom, with vertical arrows on the left and right indicating direction, including a plus symbol for positive and a minus symbol for negative. In the top “POSITIVE” section, three green speech-bubble quotes are displayed. The left quote reads “the current policies are largely sufficient, but they could be improved through more precise strategies. (WC underscore 02)”. The center quote reads “[Regulations] It’s quite structured. There are specific regulatory frameworks and technical guidelines that outline what’s required for licensing. These include environmental and operational standards ... (GO underscore 01)”. The right quote reads “With the intervention of the relevant authorities, such as the municipality, stricter procedures have been put in place to regulate waste disposal. (RF underscore 01)”. Below these quotes, three rectangular boxes are shown. The left box is labeled “Improved regulatory oversight” with the number “2” and the label “Positive”. The middle box is labeled “Regulations are not the main concern” with the number “2” and the label “Positive”. The right box is labeled “Clear regulations with limited implementation” with the number “6” and the label “Positive”. Each box includes a horizontal bar indicator. Below these boxes, four stakeholder labels are arranged horizontally: “Academics”, “Construction contractors”, “Government Organization”, and “Recycling Facilities”. Blue dashed lines connect these stakeholders to the positive and negative factors above and below. In the bottom “NEGATIVE” section, three rectangular boxes are displayed. The left box is labeled “Licensing and inspection procedures” with the number “7” and the label “Negative”. The middle box is labeled “Lack of clear regulations” with the number “8” and the label “Negative”. The right box is labeled “Weak enforcement of regulations” with the number “11” and the label “Negative”. Each box includes a horizontal bar indicator. Below these boxes, three pink speech-bubble quotes are shown. The left quote reads “The fundamental obstacle is the weakness of legal frameworks. There are no strict regulations governing waste management, nor is there a real accountability system for violators. (WC underscore 06)”. The center quote reads “Currently, laws lack strict enforcement and effective implementation, which limits the success of recycling programs. (AC underscore 01)”. The right quote reads “There is a lack of clarity in the implementation of these policies, and their actual impact on improving waste management and recycling processes is virtually non-existent. (WC underscore 04)”. Dashed connecting lines link stakeholder groups to both positive and negative factors.

Contrasting perspectives on source segregation regulations for C&D waste in Saudi Arabia

Close modal

On one side, several participants voiced frustration with the lack of a clear and enforceable regulatory structure, describing the current system as fragmented, inconsistently applied, or poorly implemented. “The absence of a clear regulatory structure leads to disorganised waste management and non-compliance with recycling requirements by some entities.“, noted a government official [GO_02]. Another participant from a recycling facility highlighted the same issue in relation to downstream processing, stating, “Additionally, there are no clear laws mandating the transport of waste to licensed processing sites.” [RF_04].

On the other hand, some participants acknowledged recent regulatory advancements and viewed the evolving legal environment as a positive step toward formalising segregation practices. For example, a government participant remarked, “There are laws in place that require contractors to work with licensed waste hauliers and ensure proper disposal.” [GO_03]. Another participant highlighted the guidance offered by national regulatory bodies, noting, “For contractors, the National Centre for Waste Management 'Mawan's regulations provide a clear answer. The laws clearly state the need to utilise C&D waste.” [RF_04]. These views reflect growing awareness of national initiatives that aim to standardise recycling and disposal practices across the construction industry. Interestingly, not all participants viewed regulation as the primary driver of change. Some expressed scepticism toward policy reliance, arguing that regulation alone may not ensure compliance or foster innovation. “I don't believe regulations and policies are always the solutions.“, commented a recycling facility representative [RF_05], suggesting that complementary approaches (e.g. education, incentives, and industry-led practices) may be equally important in encouraging effective segregation behaviour.

Also, it is worth mentioning that many participants proposed specific policy recommendations that, in their opinion, could significantly accelerate the implementation of source segregation for C&D waste in Saudi Arabia. A recurring suggestion was the introduction of financial instruments and regulatory incentives to shift behaviours and promote compliance. One waste company representative emphasised the importance of financial mechanisms, stating, “Taxation, money, and money make everything work. I know it's often difficult, and it's unpopular. But unfortunately, you know, while waste management is a free-to-use service, change won't happen.” [WC_01]. Another participant proposed a graduated requirement system for the use of recycled materials in public projects, outlining, “Government projects should require 35% recycled material to stimulate demand and sector growth. All road, paving, and concrete barrier projects should use 100% recycled materials. Projects valued at less than SAR 50 million should use at least 10% recycled materials. Projects valued between SAR 50–100 million should use 20% recycled materials. Projects over SAR 100 million should use 30% recycled materials.” [GO_04].

The thematic analysis revealed a strong consensus among participants regarding the critical role of cross-sector collaboration in enhancing the source segregation of C&D waste in Saudi Arabia. Participants consistently emphasised that effective and sustainable waste management cannot be achieved in isolation. Instead, it requires coordinated action among a broad spectrum of stakeholders (e.g. government agencies, private sector actors, civil society, and educational institutions).

As one academic participant stated, “Sustainable solutions require collaboration among different stakeholders, including the government, companies, educational institutions, and civil society.” [AC_01]. Another participant elaborated on the practical outcomes of such cooperation, noting, “By fostering collaboration between companies, regulatory bodies, and the community, we can achieve a real shift towards more efficient and sustainable waste management, benefiting the environment and the economy” [WC_07]. A particularly notable sub-theme emerging from the interviews was the call for stronger collaboration between educational institutions/universities and the C&D waste management industry. Participants viewed education not only as a channel for raising public awareness but also as a strategic partner in shaping the future workforce and embedding sustainable practices. “Establishing partnerships with higher education institutions could be beneficial in developing specialised educational programmes focused on recycling and waste management.” explained one academic participant [AC_01]. Others described ongoing efforts: “We are involved in various educational initiatives to raise awareness about the importance of recycling. For example, we organise workshops in schools and universities to teach students how they can contribute to recycling efforts.” [RF_06].

In addition to the education sector, participants also highlighted the essential role of local communities in supporting source segregation initiatives. There was a clear belief that public engagement, awareness-building, and behavioural change at the community level were necessary for long-term success. As one participant explained, “The community plays a crucial role in supporting these efforts. Strengthening communication between individuals and society about the importance of waste sorting and how each person can contribute is vital …..” [AC_01]. Finally, the National Centre for Waste Management (NCWM) was repeatedly identified as a key institutional stakeholder with a central regulatory and facilitative role in the development of source segregation systems. Participants acknowledged the authority of the NCWM in licencing and oversight, as well as its responsiveness in resolving implementation challenges.

Participants widely recognised the critical role of source segregation in enabling the CE, particularly within the C&D waste sector. Many emphasised that segregation is not just a technical step in waste management but the very foundation upon which circular practices are built. Efficient sorting at the source was described as a prerequisite for the feasibility of downstream recycling, reuse, and material recovery:

“Why is waste segregation at the source considered the backbone of the circular economy? The reason is that this process determines whether recycling will be feasible later or not.” [WC_03].

“Waste sorting is the foundation of the circular economy—rather than discarding everything, we reuse it, reducing pressure on natural resources.” [GO_04].

However, some participants emphasised that the CE should not be approached as an isolated concept, but rather as part of a broader economic and institutional framework. One participant argued for a transitional phase that first establishes a functioning “waste economy” to pave the way for circularity: “Now, until you end up having a kind of an economy, a waste economy, I mean obviously we want to move towards a circular economy, but certainly the first stage would be a waste economy where there's money flowing around and people come because it's privatised, it's not a public, it's a privatised industry.” [WC_01].

The five themes derived from the thematic analysis collectively reveal how source segregation of C&D waste in Saudi Arabia is shaped by institutional, behavioural, and governance dynamics that extend far beyond technical considerations. The first theme reveals a clear paradox between recognition and enactment: while participants widely acknowledge the economic and environmental benefits of source segregation, actual on-site implementation remains rare. This intention–action gap reflects institutional inertia driven by weak incentives, limited enforcement, and entrenched operational norms. Unlike previous studies in other regions (e.g. China and India) that attribute low segregation rates to logistical or financial constraints (Huang et al., 2018; Shooshtarian et al., 2020), a closer reading of participants' responses in this study points to a distinct contextual factor, which is institutional mistrust. Participants expressed doubts about whether segregated materials would remain separated after collection and revealing a systemic credibility deficit that undermines behavioural commitment. These findings therefore extend the CE debate by reframing segregation not only as a technical or behavioural challenge, but also as a trust-dependent institutional process in which consistent enforcement, transparent monitoring, and credible supply-chain governance are important requirements for sustained adoption.

Building on this, the second theme examines the barriers to source segregation (e.g. limited awareness, high costs, and institutional fragmentation) as an interlocking system of constraints rather than isolated ones. This systemic interplay mirrors findings in other governance contexts where regulatory ambiguity and overlapping mandates weaken implementation coherence (Figueiredo et al., 2024; Oluleye et al., 2022; Walters et al., 2024). In Saudi Arabia, poor inter-agency coordination and top-down control increase uncertainty and reduce private-sector commitment, confirming the institutional theory's claims that unclear authority encourages compliance minimalism. Divergent perceptions of regulation further reveal power asymmetries: while government bodies view regulation as progress, firms interpret it as a cost burden (Andersson and Buser, 2022; Figueiredo et al., 2024). Moreover, the overreliance on digitalisation as a solution reflects a bias that overlooks governance and trust deficits. Thus, this study advances previous research by showing that Saudi Arabia's challenge is not only technological but also institutional maturity, where effective segregation depends on coordinated authority, legitimacy, and participatory governance rather than automation alone.

This pattern of institutional fragmentation becomes more explicit in the third theme, which exposes a regulatory paradox in Saudi Arabia's waste governance. Participants' mixed views on regulation reflect overlapping mandates, inconsistent enforcement, and weak coordination, aligning with global concerns over policy incoherence in fragmented environmental systems (Leonardo et al., 2025; Maria et al., 2020). While similar structural misalignments have hindered CE transitions in Europe (Kirchherr et al., 2017), the Saudi case is distinguished by its top-down regulatory culture, which limits regional consistency and stakeholder engagement. Participants' recognition that “regulation alone cannot drive change” signals a shift toward hybrid governance, where legal frameworks must be complemented by incentives and collaborative mechanisms (Leonardo et al., 2025). Consequently, this research reframes Saudi waste policy as a coordination challenge, arguing that effective CE transitions require integrated and trust-based governance rather than fragmented or purely regulatory reform.

From regulation, the discussion moves toward stakeholder collaboration, which is the focus of the fourth theme. Here, source segregation is revealed to be relational, rather than procedural, relying on the strength of collaboration across academia, government, industry, and communities. Participants highlighted that sustainable waste management cannot be achieved through regulation alone but through multi-actor partnerships that combine knowledge, resources, and local engagement, consistent with collaborative governance theory (Valentina et al., 2025; Vasconcelos et al., 2022). However, in Saudi Arabia, such collaboration remains fragmented and state-dependent, with universities, private firms, and regulators engaging in short-term or top-down initiatives rather than sustained co-production. While previous studies emphasise universities' role as boundary organisations and knowledge brokers (Olayiwola et al., 2023), this study shows how power asymmetries and institutional dependency constrain that role. The paradox of state-led collaboration, where the government functions as both enabler and barrier, limits innovation and shared ownership. Here, this research advances existing literature by framing collaboration not as a normative goal but as a structural necessity, where horizontal trust-building and intermediary institutions are essential for advancing CE transitions in centralised governance systems.

Finally, the fifth theme situates segregation within the broader vision of the CE, presenting it as the sector's structural foundation. However, this research adds contextual depth by revealing a locally grounded understanding of circularity as a phased transition rather than an immediate systemic shift. Participants' idea of a “waste economy” as a transitional phase reflects a pragmatic adaptation to Saudi Arabia's limited regulatory maturity and infrastructural capacity. While the emphasis on digitalisation as a driver of circular progress aligns with global smart-city trends, this research emphasises that the efficacy of technology depends on equitable access and effective governance.

A closer reading of the interview data reveals deeper relationships and systemic dynamics shaping the current situation in Saudi Arabia. For example, Figure 4 reveals critical insights into how different stakeholder groups engage with the issue of source segregation in the C&D waste sector. As illustrated in Panel (a), construction contractors and C&D waste services providers and recycling facilities were the most vocal contributors to themes related to barriers and enablers, reflecting their operational involvement and first-hand exposure to daily challenges. In contrast, while other themes (e.g. policies and regulations, stakeholder roles and collaboration, and CE integration) were acknowledged, they received relatively less emphasis from most participant groups. This suggests that discussions around source segregation in Saudi Arabia are still predominantly shaped by immediate practical challenges and perceived opportunities, rather than by broader systemic or strategic considerations. Furthermore, Panel (b) highlights the nuanced understanding of barriers across stakeholder groups. While academics, construction contractors and C&D waste services providers, and government organisations commonly emphasised tangible obstacles such as high operational costs and lack of awareness, representatives from recycling facilities echoed these concerns but placed additional emphasis on the issue of overlapping institutional responsibilities, reflecting their challenges in navigating regulatory fragmentation.

Figure 4
Two Sankey diagrams show themes and main barriers linked to stakeholder groups.The Sankey diagram consists of two panels labeled “(a) themes” and “(b) main common barriers”, each showing flows from left-side categories to right-side stakeholder groups using connecting bands of varying thickness. In panel “(a) themes”, five themes are listed on the left from top to bottom: “[Theme (2): Barriers and Enablers]”, “[Theme (1): Source Segregation Current Practices and Benefits]”, “[Theme (3): Policy and Regulations]”, “[Theme (4): Stakeholder Roles and Collaboration]”, and “[Theme (5): Circular Economy Integration and Future Opportunities]”. On the right side, four stakeholder groups are shown from top to bottom as “C and D Waste Companies”, “Academics”, “Recycling Facilities”, and “Government Organization”. Curved bands connect each theme to one or more stakeholder groups, with thicker bands indicating stronger or more frequent connections. In panel “(b) main common barriers”, a list of barriers appears on the left from top to bottom: “High operational cost of segregation”, “Insufficient recycling infrastructure”, “Lack of awareness”, “Lack of transparency in segregation practices”, “Lack of clear regulations”, “Lack of implementation of source separation”, “Public skepticism toward recycled product quality”, “Price mismatch of recycled vs. raw materials”, “Variability in materials”, “Overlapping responsibilities”, and “Licensing and inspection procedures”. On the right side, the same stakeholder groups are shown from top to bottom as “Academics”, “C and D Waste Companies”, “Government Organization”, and “Recycling Facilities”. Multiple curved bands connect each barrier to one or more stakeholder groups, with varying thickness representing the relative strength of association. The flow in both panels runs from left to right.

Participant group contributions across (a) themes and (b) common barriers

Figure 4
Two Sankey diagrams show themes and main barriers linked to stakeholder groups.The Sankey diagram consists of two panels labeled “(a) themes” and “(b) main common barriers”, each showing flows from left-side categories to right-side stakeholder groups using connecting bands of varying thickness. In panel “(a) themes”, five themes are listed on the left from top to bottom: “[Theme (2): Barriers and Enablers]”, “[Theme (1): Source Segregation Current Practices and Benefits]”, “[Theme (3): Policy and Regulations]”, “[Theme (4): Stakeholder Roles and Collaboration]”, and “[Theme (5): Circular Economy Integration and Future Opportunities]”. On the right side, four stakeholder groups are shown from top to bottom as “C and D Waste Companies”, “Academics”, “Recycling Facilities”, and “Government Organization”. Curved bands connect each theme to one or more stakeholder groups, with thicker bands indicating stronger or more frequent connections. In panel “(b) main common barriers”, a list of barriers appears on the left from top to bottom: “High operational cost of segregation”, “Insufficient recycling infrastructure”, “Lack of awareness”, “Lack of transparency in segregation practices”, “Lack of clear regulations”, “Lack of implementation of source separation”, “Public skepticism toward recycled product quality”, “Price mismatch of recycled vs. raw materials”, “Variability in materials”, “Overlapping responsibilities”, and “Licensing and inspection procedures”. On the right side, the same stakeholder groups are shown from top to bottom as “Academics”, “C and D Waste Companies”, “Government Organization”, and “Recycling Facilities”. Multiple curved bands connect each barrier to one or more stakeholder groups, with varying thickness representing the relative strength of association. The flow in both panels runs from left to right.

Participant group contributions across (a) themes and (b) common barriers

Close modal

Moreover, although the correlation analysis (Figure 5) revealed mostly weak or non-significant relationships between participants' years of experience and their emphasis on key themes, this pattern is itself revealing. The absence of strong correlations suggests that perceptions of barriers, regulatory gaps, and collaboration challenges are systemic rather than experiential, cutting across professional seniority. In other words, institutional conditions, not individual experience, shape how actors interpret the feasibility of source segregation. The only significant trend, a moderate negative correlation for barriers and enablers (r = −0.51, p < 0.05), indicates that less experienced participants perceived structural obstacles more sharply, likely due to their direct engagement with on-site operations.

Figure 5
A multi-panel scatter plot shows relationships between age and theme density across five themes with trend lines.The multi-panel scatter plot consists of five panels arranged in two rows with one centered panel below. Each panel is drawn on a coordinate plane with the horizontal axis labeled “Age” ranging from 4 to 14 in increments of 1 unit, and the vertical axis labeled “Theme Density” with panel-specific ranges. Each panel includes scattered data points and a regression line, where Themes 1, 3, 4, and 5 use a red dashed line, and Theme 2 uses a solid red line. Panel 1 titled “Theme (1): Source Segregation Current Practices and Benefits”: The vertical axis ranges from 0 to 12 in increments of 2 units. A red dashed regression line slopes downward from left to right. The dashed line starts at (3, 6) and ends at (15, 5). The correlation is labeled “r equals negative 0.21 (ns)”. The scattered points include (3, 7), (5, 0), (8, 13), (10, 8), and (15, 2). Panel 2 titled “Theme (2): Barriers and Enablers”: The vertical axis ranges from 5 to 25 in increments of 5 units. The solid regression line slopes downward from (3, 16) to (15, 7). The correlation is labeled “r equals negative 0.51 (p less than 0.05)”. Sample points include (3, 7), (5, 25), (8, 22), (10, 4), and (15, 9). Panel 3 titled “Theme (3): Policy and Regulations”: The vertical axis ranges from 0 to 7 in increments of 1 unit. The dashed regression line slopes downward from (3, 4.5) to (15, 3). The correlation is labeled “r equals negative 0.30 (ns)”. Sample points include (3, 7), (6, 1), (8, 7), (10, 3), and (15, 1). Panel 4 titled “Theme (4): Stakeholder Roles and Collaboration”: The vertical axis ranges from 0 to 15 in increments of 5 units. The dashed regression line slopes downward from (3, 5.5) to (15, 2). The correlation is labeled “r equals negative 0.25 (ns)”. Sample points include (3, 1), (5, 13), (8, 18), (10, 6), and (15, 1). Panel 5 titled “Theme (5): Circular Economy Integration and Future Opportunities”: The vertical axis ranges from 0 to 3 in increments of 0.5 unit. The dashed regression line slopes downward from (3, 1.2) to (15, 0.8). The correlation is labeled “r equals negative 0.21 (ns)”. Sample points include (3, 1), (6, 2), (8, 3), (10, 0), and (15, 1). Note: All numerical data values are approximated.

Correlation analysis between participants years of experience and emphasis on key thematic areas of C&D waste source segregation in Saudi Arabia

Figure 5
A multi-panel scatter plot shows relationships between age and theme density across five themes with trend lines.The multi-panel scatter plot consists of five panels arranged in two rows with one centered panel below. Each panel is drawn on a coordinate plane with the horizontal axis labeled “Age” ranging from 4 to 14 in increments of 1 unit, and the vertical axis labeled “Theme Density” with panel-specific ranges. Each panel includes scattered data points and a regression line, where Themes 1, 3, 4, and 5 use a red dashed line, and Theme 2 uses a solid red line. Panel 1 titled “Theme (1): Source Segregation Current Practices and Benefits”: The vertical axis ranges from 0 to 12 in increments of 2 units. A red dashed regression line slopes downward from left to right. The dashed line starts at (3, 6) and ends at (15, 5). The correlation is labeled “r equals negative 0.21 (ns)”. The scattered points include (3, 7), (5, 0), (8, 13), (10, 8), and (15, 2). Panel 2 titled “Theme (2): Barriers and Enablers”: The vertical axis ranges from 5 to 25 in increments of 5 units. The solid regression line slopes downward from (3, 16) to (15, 7). The correlation is labeled “r equals negative 0.51 (p less than 0.05)”. Sample points include (3, 7), (5, 25), (8, 22), (10, 4), and (15, 9). Panel 3 titled “Theme (3): Policy and Regulations”: The vertical axis ranges from 0 to 7 in increments of 1 unit. The dashed regression line slopes downward from (3, 4.5) to (15, 3). The correlation is labeled “r equals negative 0.30 (ns)”. Sample points include (3, 7), (6, 1), (8, 7), (10, 3), and (15, 1). Panel 4 titled “Theme (4): Stakeholder Roles and Collaboration”: The vertical axis ranges from 0 to 15 in increments of 5 units. The dashed regression line slopes downward from (3, 5.5) to (15, 2). The correlation is labeled “r equals negative 0.25 (ns)”. Sample points include (3, 1), (5, 13), (8, 18), (10, 6), and (15, 1). Panel 5 titled “Theme (5): Circular Economy Integration and Future Opportunities”: The vertical axis ranges from 0 to 3 in increments of 0.5 unit. The dashed regression line slopes downward from (3, 1.2) to (15, 0.8). The correlation is labeled “r equals negative 0.21 (ns)”. Sample points include (3, 1), (6, 2), (8, 3), (10, 0), and (15, 1). Note: All numerical data values are approximated.

Correlation analysis between participants years of experience and emphasis on key thematic areas of C&D waste source segregation in Saudi Arabia

Close modal

This study explored the multifaceted landscape of source segregation in the C&D waste sector in Saudi Arabia. The findings reveal that while stakeholders strongly support the principles of source segregation, its implementation across Saudi Arabia remains inconsistent, underregulated, and underutilised. Systemic barriers such as lack of awareness, high operational costs, overlapping responsibilities, and infrastructure limitations continue to hinder progress. The study also highlights strong enabling conditions: the promise of technology, emerging regulatory frameworks, academic-industry partnerships, and the growing engagement of the NCWM. Importantly, the analysis showed that less experienced participants placed greater emphasis on barriers and enabling factors, suggesting a generational lens through which the urgency of reform is perceived. Also, findings demonstrate that the challenge of advancing source segregation in Saudi Arabia lies in other factors, such as socio-institutional configuration. The results show how weak coordination, fragmented mandates, and limited institutional trust constrain the translation of policy ambition into on-site practice.

Additionally, this study makes valuable contributions across theoretical, practical, and policy dimensions. Theoretically, it contributes to understanding the socio-institutional complexity of circular transitions by showing how behavioural intentions, regulatory structures, and trust dynamics interact to shape implementation outcomes in emerging economies. In terms of industry practice, this study identifies the real-world barriers and enablers from the participants' point of view, offering actionable insights for improving source segregation processes, increasing the end-users of products with recycled content (PwRC), and enhancing cross-sector collaboration. From a policy dimension, the findings of this study inform the development of clearer regulatory frameworks, targeted incentives, and public-private coordination mechanisms.

While this study offers valuable insights into the implementation of source segregation in the C&D waste sector in Saudi Arabia, some limitations should be acknowledged. First, the research is based on a qualitative thematic analysis of interviews with a relatively small and targeted group of stakeholders. Although these participants were diverse and represented key sectors (e.g. government, private companies, academia, and recycling facilities), the findings may not fully capture the perspectives of all actors involved in this space, such as informal workers, local contractors, or PwRC. Moreover, the use of purposeful sampling, while appropriate for identifying information-rich cases, may limit the generalisability of the findings, as participants were selected based on expertise and relevance rather than random representation.

Building on the findings of this study, future research should aim to broaden both the methodological scope and participant base. Quantitative studies using surveys or statistical modelling (e.g. structural equation modelling (SEM) or agent-based simulations) could complement qualitative insights and enable generalisability across larger populations. Comparative analyses between cities or regions within Saudi Arabia, or even across different countries, including those in the MENA region, would also be valuable in identifying context-specific challenges and best practices in source segregation. From a policy perspective, future work could explore how segregation performance indicators might be integrated into Saudi Arabia's Vision 2030 sustainability frameworks, particularly through the NCWM and municipal regulations. For industry stakeholders, further research should investigate the economic viability and environmental impacts of different segregation models to inform more data-driven policy and decisions.

Ethical approval granted by XX University (No. 2024–27526-25483).

The authors thank all participants

The supplementary material for this article can be found online.

Alazmi
,
S.
,
Abdelmegid
,
M.
,
Sarhan
,
S.
,
Poshdar
,
M.
,
Gonzalez
,
V.
and
Bidhendi
,
A.
(
2025
), “
An integrated framework to improve waste management practices and environmental awareness in the Saudi construction industry
”,
Cleaner Waste Systems
, Vol. 
10
, 100195, doi: .
Alsheyab
,
M.A.T.
(
2022
), “
Recycling of construction and demolition waste and its impact on climate change and sustainable development
”,
International Journal of Environmental Science and Technology
, Vol. 
19
No. 
3
, pp. 
2129
-
2138
, doi: .
Andersson
,
R.
and
Buser
,
M.
(
2022
), “
From waste to resource management? Construction and demolition waste management through the lens of institutional work
”,
Construction Management & Economics
, Vol. 
40
No. 
6
, pp. 
477
-
496
, doi: .
ATLAS.ti
(
2025
), “
Master your research projects with the power of AI
”,
ATLAS.Ti
,
available at:
 https://atlasti.com/ (
accessed
 4 April 2025).
Atta
,
I.
and
Bakhoum
,
E.S.
(
2024
), “
Environmental feasibility of recycling construction and demolition waste
”,
International Journal of Environmental Science and Technology
, Vol. 
21
No. 
3
, pp. 
2675
-
2694
, doi: .
Blaisi
,
N.I.
(
2019
), “
Construction and demolition waste management in Saudi Arabia: current practice and roadmap for sustainable management
”,
Journal of Cleaner Production
, Vol. 
221
, pp. 
167
-
175
, doi: .
Braun
,
V.
and
Clarke
,
V.
(
2006
), “
Using thematic analysis in psychology
”,
Qualitative Research in Psychology
, Vol. 
3
No. 
2
, pp. 
77
-
101
, doi: .
Colmenero Fonseca
,
F.
,
Cárcel-Carrasco
,
J.
,
Preciado
,
A.
,
Martínez-Corral
,
A.
and
Salas Montoya
,
A.
(
2023
), “
Comparative analysis of the European regulatory framework for C&D waste management
”,
Advances in Civil Engineering
, Vol. 
2023
No. 
1
, pp. 6421442 doi: .
Creswell
,
J.W.
and
Creswell
,
J.D.
(
2014
),
Research Design: Qualitative, Quantitative, and Mixed Methods Approaches
, (6th ed.) ,
SAGE Publications
,
Thousand Oaks, CA
.
Dahlmans
,
H.
,
Goessling
,
T.
and
Kenis
,
P.
(
2024
), “
Beyond acquiescence and compromise: organizational strategies in pluralizing institutional environments
”,
European Management Review
, Vol. 
21
No. 
3
, pp. 
645
-
658
, doi: .
Figueiredo
,
K.
,
Najjar
,
M.K.
,
Hammad
,
A.W.A.
and
Haddad
,
A.N.
(
2024
), “6 - standards and legal regulations regarding sustainable construction”, in
Haddad
,
A.N.
,
Hammad
,
A.W.A.
and
Figueiredo
,
K.
(Eds),
Materials Selection for Sustainability in the Built Environment
,
Woodhead Publishing
, pp. 
117
-
130
, doi: .
Finamore
,
M.
and
Oltean-Dumbrava
,
C.
(
2024
), “
Circular economy in construction - findings from a literature review
”,
Heliyon
, Vol. 
10
No. 
15
, e34647, doi: .
Gummesson
,
E.
(
2006
), “
Qualitative research in management: Addressing Complexity, Context and persona
”,
(edited by Cassell, C.)
,
Management Decision
, Vol. 
44
No. 
2
, pp. 
167
-
179
, doi: .
Haas
,
M.
,
Galler
,
R.
,
Scibile
,
L.
and
Benedikt
,
M.
(
2020
), “
Waste or valuable resource – a critical European review on re-using and managing tunnel excavation material
”,
Resources, Conservation and Recycling
, Vol. 
162
, 105048, doi: .
Haider
,
H.
,
AlMarshod
,
S.Y.
,
AlSaleem
,
S.S.
,
Ali
,
A.A.M.
,
Alinizzi
,
M.
,
Alresheedi
,
M.T.
and
Shafiquzzaman
,
Md.
(
2022
), “
Life cycle assessment of construction and demolition waste management in Riyadh, Saudi Arabia
”,
International Journal of Environmental Research and Public Health
, Vol. 
19
No. 
12
, 7382, doi: .
Hasibuan
,
G.C.R.
,
Al Fath
,
M.T.
,
Yusof
,
N.
,
Dewi
,
R.A.
,
Syafridon
,
G.G.A.
,
Jaya
,
I.
,
Anas
,
M.R.
and
Syahrizal
(
2025
), “
Integrating circular economy into construction and demolition waste management: a bibliometric review of sustainable engineering practices in the built environment
”,
Case Studies in Chemical and Environmental Engineering
, Vol. 
11
, 101159, doi: .
Hassan
,
S.H.
,
Aziz
,
H.A.
,
Johari
,
I.
and
Hung
,
Y.-T.
(
2022
), “Construction and demolition (C&D) waste management and disposal”, in
Wang
,
L.K.
,
Wang
,
M.-H.S.
and
Hung
,
Y.-T.
(Eds),
Solid Waste Engineering and Management
,
Springer International Publishing
,
Cham
, Vol. 
2
, pp. 
165
-
216
, doi: .
Hemidat
,
S.
,
Achouri
,
O.
,
El Fels
,
L.
,
Elagroudy
,
S.
,
Hafidi
,
M.
,
Chaouki
,
B.
,
Ahmed
,
M.
,
Hodgkinson
,
I.
and
Guo
,
J.
(
2022
), “
Solid waste management in the context of a circular economy in the MENA region
”,
Sustainability
, Vol. 
14
No. 
1
, p.
480
, doi: .
Herchline
,
D.
(
2024
), “
Methodological progress note: purposeful sampling in qualitative research
”,
Journal of Hospital Medicine
, Vol. 
n/a
No. 
n/a
, pp. 
485
-
488
, doi: .
Huang
,
B.
,
Wang
,
X.
,
Kua
,
H.
,
Geng
,
Y.
,
Bleischwitz
,
R.
and
Ren
,
J.
(
2018
), “
Construction and demolition waste management in China through the 3R principle
”,
Resources, Conservation and Recycling
, Vol. 
129
, pp. 
36
-
44
, doi: .
Iacoboaea
,
C.
,
Aldea
,
M.
and
Petrescu
,
F.
(
2019
), “
Construction and demolition waste-a challenge for the European Union?
”,
Theoretical and Empirical Researches in Urban Management
, Vol. 
14
No. 
1
, pp. 
30
-
52
.
Kirchherr
,
J.
,
Reike
,
D.
and
Hekkert
,
M.
(
2017
), “
Conceptualizing the circular economy: an analysis of 114 definitions
”,
Resources, Conservation and Recycling
, Vol. 
127
, pp. 
221
-
232
, doi: .
Lee
,
S.
,
Chang
,
H.
and
Lee
,
J.
(
2024
), “
Construction and demolition waste management and its impacts on the environment and human health: moving forward sustainability enhancement
”,
Sustainable Cities and Society
, Vol. 
115
, 105855, doi: .
Leonardo
,
B.
,
Bova
,
D.M.
and
Luca
,
R.
(
2025
), “
Win together or lose alone: circular economy and hybrid governance for natural resource commons
”,
Journal of Cleaner Production
, Vol. 
486
, 144520, doi: .
Li
,
P.
,
Dahmus
,
J.
,
Guldberg
,
S.
,
Riddervold
,
H.O.
and
Kirchain
,
R.
(
2011
), “
How much sorting is enough
”,
Journal of Industrial Ecology
, Vol. 
15
No. 
5
, pp. 
743
-
759
, doi: .
Mandpe
,
A.
,
Paliya
,
S.
,
Gedam
,
V.V.
,
Patel
,
S.
,
Tyagi
,
L.
and
Kumar
,
S.
(
2023
), “
Circular economy approach for sustainable solid waste management: a developing economy perspective
”,
Waste Management & Research
, Vol. 
41
No. 
3
, pp. 
499
-
511
, doi: .
Maria
,
D.L.
,
Maria-Therese
,
G.
and
Ece
,
K.
(
2020
), “
Global adaptation governance: explaining the governance responses of international organizations to new issue linkages
”,
Environmental Science & Policy
, Vol. 
114
, pp. 
204
-
215
, doi: .
Mayanti
,
B.
and
Helo
,
P.
(
2024
), “
Circular economy through waste reverse logistics under extended producer responsibility in Finland
”,
Waste Management & Research
, Vol. 
42
No. 
1
, pp. 
59
-
73
, doi: .
Menegaki
,
M.
and
Damigos
,
D.
(
2018
), “
A review on current situation and challenges of construction and demolition waste management
”,
Reuse and Recycling/UN SGDs: How Can Sustainable Chemistry Contribute? / Green Chemistry in Education
, Vol. 
13
, pp. 
8
-
15
, doi: .
MWAN
(
2019
), “
National waste management law
”,
Official Saudi Arabia Government website, available at:
 https://mwan.gov.sa/en (
accessed
 3 February 2025).
NCEC
(
2019
), “
National center for environmental compliance
”,
available at:
 https://ncec.gov.sa/ar/Pages/default.aspx (
accessed
 3 February 2025).
Nie
,
P.
,
Dahanayake
,
K.C.
and
Sumanarathna
,
N.
(
2024
), “
Exploring UAE's transition towards circular economy through construction and demolition waste management in the pre-construction stage–A case study approach
”,
Smart and Sustainable Built Environment
, Vol. 
13
No. 
2
, pp. 
246
-
266
, doi: .
Noufal
,
M.J.
,
Maalla
,
Z.A.
and
Adipah
,
S.
(
2020
), “
Challenges and opportunities of municipal solid waste management system in Homs city, Syria
”,
Proceedings of the Institution of Civil Engineers - Waste and Resource Management
, Vol. 
173
No. 
2
, pp. 
40
-
53
, doi: .
Olayiwola
,
J.
,
Yusuf
,
A.O.
,
Akanmu
,
A.A.
,
Murzi
,
H.
,
Gao
,
X.
and
Afsari
,
K.
(
2023
), “
Construction practice knowledge for complementing classroom teaching during site visits
”,
Smart and Sustainable Built Environment
, Vol. 
14
No. 
1
, pp. 
119
-
139
, doi: .
Oluleye
,
B.I.
,
Chan
,
D.W.M.
and
Olawumi
,
T.O.
(
2022
), “
Barriers to circular economy adoption and concomitant implementation strategies in building construction and demolition waste management: a PRISMA and interpretive structural modeling approach
”,
Habitat International
, Vol. 
126
, 102615, doi: .
Ouda
,
O.K.M.
,
Peterson
,
H.P.
,
Rehan
,
M.
,
Sadef
,
Y.
,
Alghazo
,
J.M.
and
Nizami
,
A.S.
(
2018
), “
A case study of sustainable construction waste management in Saudi Arabia
”,
Waste and Biomass Valorization
, Vol. 
9
No. 
12
, pp. 
2541
-
2555
, doi: .
Palinkas
,
L.A.
,
Horwitz
,
S.M.
,
Green
,
C.A.
,
Wisdom
,
J.P.
,
Duan
,
N.
and
Hoagwood
,
K.
(
2015
), “
Purposeful sampling for qualitative data collection and analysis in mixed method implementation research
”,
Administration and Policy in Mental Health and Mental Health Services Research
, Vol. 
42
No. 
5
, pp. 
533
-
544
, doi: .
Poon
,
C.S.
,
Yu
,
A.T.W.
and
Ng
,
L.H.
(
2001
), “
On-site sorting of construction and demolition waste in Hong Kong
”,
Resources, Conservation and Recycling
, Vol. 
32
No. 
2
, pp. 
157
-
172
, doi: .
Purchase
,
C.K.
,
Al Zulayq
,
D.M.
,
O'Brien
,
B.T.
,
Kowalewski
,
M.J.
,
Berenjian
,
A.
,
Tarighaleslami
,
A.H.
and
Seifan
,
M.
(
2022
), “
Circular economy of construction and demolition waste: a literature review on lessons, challenges, and benefits
”,
Materials
, Vol. 
15
No. 
1
, p.
76
, doi: .
Rangga
,
J.
,
Syed Ismail
,
S.
,
Rasdi
,
I.
and
Karuppiah
,
K.
(
2023
), “
Estimation of leachate volume and treatment cost avoidance through waste segregation programme in Malaysia
”,
Pertanika Journal of Science and Technology
, Vol. 
32
No. 
1
, pp. 
339
-
364
, doi: .
Sarhan
,
J.G.
,
Xia
,
B.
,
Fawzia
,
S.
and
Karim
,
A.
(
2017
), “
Lean construction implementation in the Saudi Arabian construction industry
”,
Construction Economics and Building
, Vol. 
17
No. 
1
, pp. 
46
-
69
, doi: .
Scott
,
W.R.
(
2013
),
Institutions and Organizations Ideas, Interests, and Identities
, (4th ed.) ,
Sage Publications
,
London
.
Serge Kubanza
,
N.
and
Simatele
,
M.D.
(
2020
), “
Sustainable solid waste management in developing countries: a study of institutional strengthening for solid waste management in Johannesburg, South Africa
”,
Journal of Environmental Planning and Management
, Vol. 
63
No. 
2
, pp. 
175
-
188
, doi: .
Shooshtarian
,
S.
,
Caldera
,
S.
,
Maqsood
,
T.
and
Ryley
,
T.
(
2020
), “
Using recycled construction and demolition waste products: a review of stakeholders' perceptions, decisions, and motivations
”,
Recycling
, Vol. 
5
No. 
4
, p.
31
, doi: .
Soto-Paz
,
J.
,
Arroyo
,
O.
,
Torres-Guevara
,
L.E.
,
Parra-Orobio
,
B.A.
and
Casallas-Ojeda
,
M.
(
2023
), “
The circular economy in the construction and demolition waste management: a comparative analysis in emerging and developed countries
”,
Journal of Building Engineering
, Vol. 
78
, 107724, doi: .
Swarnakar
,
V.
and
Khalfan
,
M.
(
2024
), “
Circular economy in construction and demolition waste management: an in-depth review and future perspectives in the construction sector
”,
Smart and Sustainable Built Environment
, Vol. 
ahead-of-print
No. 
ahead-of-print
, doi: .
Talla
,
A.
and
McIlwaine
,
S.
(
2024
), “
Industry 4.0 and the circular economy: using design-stage digital technology to reduce construction waste
”,
Smart and Sustainable Built Environment
, Vol. 
13
No. 
1
, pp. 
179
-
198
, doi: .
Townsend
,
T.G.
and
Anshassi
,
M.
(
2023
),
Construction and Demolition Debris
,
Springer International Publishing
,
Cham
, doi: .
Ulubeyli
,
S.
,
Kazaz
,
A.
and
Arslan
,
V.
(
2017
), “
Construction and demolition waste recycling plants revisited: management issues
”,
Modern Building Materials, Structures and Techniques
, Vol. 
172
, pp. 
1190
-
1197
, doi: .
Valentina
,
T.R.
,
Putera
,
R.E.
and
Salsabila
,
L.
(
2025
), “
Collaborative governance in handling the waste crisis: a systematic literature review
”,
International Journal of Sustainable Development and Planning
, Vol. 
20
No. 
2
, pp. 
761
-
770
, doi: .
Vasconcelos
,
L.T.
,
Silva
,
F.Z.
,
Ferreira
,
F.G.
,
Martinho
,
G.
,
Pires
,
A.
and
Ferreira
,
J.C.
(
2022
), “
Collaborative process design for waste management: co-constructing strategies with stakeholders
”,
Environment, Development and Sustainability
, Vol. 
24
No. 
7
, pp. 
9243
-
9259
, doi: .
Walters
,
J.P.
,
Véliz
,
K.
,
Vargas
,
M.
and
Busco
,
C.
(
2024
), “
A systems-focused assessment of policies for circular economy in construction demolition waste management in the Aysén region of Chile
”,
Sustainable Futures
, Vol. 
7
, 100186, doi: .
Wang
,
J.
,
Yuan
,
H.
,
Kang
,
X.
and
Lu
,
W.
(
2010
), “
Critical success factors for on-site sorting of construction waste: a China study
”,
Resources, Conservation and Recycling
, Vol. 
54
No. 
11
, pp. 
931
-
936
, doi: .
Published by Emerald Publishing Limited. This article is published under the Creative Commons Attribution (CC BY 4.0) licence. Anyone may reproduce, distribute, translate and create derivative works of this article (for both commercial and non-commercial purposes), subject to full attribution to the original publication and authors. The full terms of this licence may be seen at Link to the terms of the CC BY 4.0 licence.

Supplementary data

or Create an Account

Close Modal
Close Modal